Quality Craftsmanship
to Keep Your Investment Protected
Guaranteed to Prevent Leaks and Pass City Inspection!
West Coast Hot Mop is dedicated to helping protect your property from expensive water damage. Our team is equipped with decades of combined experience focused solely on hand-crafted shower pans. From roman tubes to tile decks, shower decks and more, rely on our team to customize a one-of-a-kind waterproofing system that you can trust.
Company Motto
Our mission is to continually perfect our customer service, our quality workmanship, and our customer satisfaction, with the highest level of professionalism, honesty and integrity for ourselves, our customers, and the companies we represent.
Regular Shower Pan Instructions
If there is an old hot mop shower pan it must be removed to the wood framing and subfloor. Also note that the tile hardibacker gets installed after the hot mop.
Install a NEW drain. Must be the bolt-together type. (Avoid drains with plastic female threading for the bolts.)
Install drain so that the subflange is flush with the surrounding concrete or resting on the wood subfloor.
Set water threshold ("dam") to height at least 1" higher than top of finished drain. (usually three stacked 2x4's, or min of 3.5" height).
There must be at least 10" of solid blocking around the base of the walls. 2x10’s secured in between the studs flush with the studs is most common.
Any benches framed in must be solid on all sides and have at least 4" of backing on the walls around the seat where it meets a wall. Floating style seats must be solid on the underside as well.
Shower subfloor must be strong (not bend under weight) and level with no large holes or gaps.
Damless / Roll-In Style Shower Pans
The entire shower subfloor must be recessed a minimum of about 3"-4" below the outside subfloor.
The subfloor is recessed in order to set the flood level at a height at least 3/4" above the finished drain top. The hot mop will raise the finished drain top about 3/8" when complete.
* This 3/4” difference is a minimum technical requirement. Local code may require a larger difference depending on shower size, drain location, and ADA codes. Please consult your city code.
The drain subflange must be flush or no more than 1/4" above the surrounding shower subfloor.
We HIGHLY recommended using a three piece adjustable top drain for damless showers.
When recessing the shower subfloor make sure to keep the recess wall flush with the framing above it. Any jagged edges (due to jack hammer) must be smoothed out.
Linear Drain Instructions
Linear drains must have a bolting-flange (clamping coupling) assembly installed before the hot mop.
The subflange of the of drain assembly must be installed with the outer edge flush with slab or resting on top of subfloor.
Outer edge of subflange must be at least 1" away from a vertical surface (wall, bench, dam, etc).
The linear trough/channel gets inserted after the hot mop.
Complete waterproofing system for tiled showers
Maecenas neque ipsum, interdum eu enim a, rutrum tincidunt turpis.
The Benefits
Quality Customization
Using our safe and trusted technique, our team of specialists can handcraft a custom-made shower pan on-site.
Safe & Reliable
Our professional waterproofing systems are 100% safe for children, pets and adults.
The Hot Mop without The Hot Mess
You can expect our team to arrive on time and conduct each job with precision and neatness.
The West Coast Hot Mop Guarantee
Contact us today for a free quote!
Tile-ready, built tough and made to
last a lifetime.
Our shower pans are 100% custom-made using generous amounts of liquid asphalt with three layers of felt and fiberglass corners. Crafted for superior protection and longevity, they’re proven to better withstand weight and traffic when compared to flimsy liners found at discount home improvement stores.